| PROJECT NAME | CLIENT | YEAR |
|---|---|---|
| Hwedza Roads | Hwedza
Council | 2017 |
| Beitbridge Dualisation | Ministry of
Transport | 2016 |
| Westgate Stands | Ansellia | 2016 |
The project consisted of the following works:
2 megalitre reservoir
for Cold Comfort
Scheme
1km Pumping main
of 200mm PVC
pipes
Prefabricated
steelworks
600mm fencing
The site is loacated on a Hill at Cold Comfort
farm. This is the first reservoir project done by
the company. The
company managed to
show that they have the
capability to do concrete
works efficiently. The
project started in January
2002 and was completed! ! in August 2002.
The project consisted of the following works:
1 16km of tarred roads
2 15km of PVC pipes sizes ranging from 50 mm to 160mm
3 12 km of AC sewer pipes size ranging from 90 mm to 225 mm
4 Stormwater Drains
5 Culverts
The project started in January 2000 and ended in September 2000. This was the first project with sewer reticulation to be done by the company. We managed to complete the project one month ahead of the programme.
The project constisted of the following works:
15km tarred roads
18km PVC
sewer
pipes size 160mm
and 110mm
14km PVC water
pipes size ranging
from 200mm to
63mm
Stormwater drains
concrete lined and
unlined
Kerbs
Culverts
Sewer ponds
Slug pumps
The project was started in
March 2001 and it ended
January 2002. The sewer
excavation depths were
mostly 6 meters.
Due to these depth trench
slopes were done to
ensure stability of the
trenches.
The Project Constisted
of the following works:
Roads 20km tarred
with two base
layers
Stormwater drains
Culvert pipes
Blasting works
The project started in
January 2002 and was
completed in August 2002. The project was
for housing
cooperatives. This project had a lot of
blasting work due to
the presence of too
many rock outcrops on
site.
The project consisted of
the following works:
15m2 shelvert
5km road done to
highway standards
Culverts
W
hen this project was
done there was water
flowing in the river and we had to divert the water
course temporary for us
to do the works. At times
we had to compliment the
diversion channel with
pumping.
The project consisted of
the following works:
18km of tarred roads
14km of AC water
reticulation pipes
Culvert pipes
Sormwater drains
and pipes
The project started in
January 1999 and was
completed in December 2002. This was the first
housing development
project
done by the
company. Despite being
the first project in
housing infrastructure it
was completed well ahead ofschedule.
The project consisted of
the following works:
1 km road
10 000m3 Water Reservoir
500m3 Water Reservoir
8km Asbestos cement water pipeline
The organization did the 10 000m3 tank on the left and the Middle 500m3 conical Tower Water
Reservoir.