RECENT MAJOR PROJECTS

Release Power Investments had been contracted on the following projects.

PROJECT NAME CLIENT YEAR
Hwedza RoadsHwedza
Council
2017
Beitbridge DualisationMinistry of
Transport
2016
Westgate StandsAnsellia2016
Showing entries

PREVIOUS PROJECTS

Mobirise

COLD COMFORT RESERVOIR (2 MEGALITRE)

CLIENT : ASSETFIN CONSULTANT : OVE ARUP AND PARTNERS

The project consisted of the following works:

2 megalitre reservoir for Cold Comfort Scheme
1km Pumping main of 200mm PVC pipes
Prefabricated steelworks
600mm fencing

The site is loacated on a Hill at Cold Comfort farm. This is the first reservoir project done by the company. The company managed to show that they have the capability to do concrete works efficiently. The project started in January 2002 and was completed! ! in August 2002.

Mobirise

COLD COMFORT HOUSING SCHEME 

CLIENT: ASSETFIN CONSULTANTS: ROCKFEINE

The project consisted of the following works:

1 16km of tarred roads
2 15km of PVC pipes sizes ranging from 50 mm to 160mm
3 12 km of AC sewer pipes size ranging from 90 mm to 225 mm
4 Stormwater Drains
5 Culverts


The project started in January 2000 and ended in September 2000. This was the first project with sewer  reticulation to be done by the company. We managed to complete the project one month ahead of the programme.

Mobirise

WESTGATE HOUSING SCHEME 

CLIENT: ASSETFIN CONSULTANT : OVE ARUP AND PARTNERS

The project constisted of the following works:

15km tarred roads
18km PVC sewer pipes size 160mm and 110mm
14km PVC water pipes size ranging from 200mm to 63mm
Stormwater drains concrete lined and unlined
Kerbs

Culverts
Sewer ponds
Slug pumps

The project was started in March 2001 and it ended January 2002. The sewer excavation depths were mostly 6 meters. Due to these depth trench slopes were done to ensure stability of the trenches. 

Mobirise

RYEDALE RIDGE HOUSING SCHEME

CLIENT: HOUSING PEOPLE OF ZIMBABWE (HPZ) CONSULTANT: HPZ

The Project Constisted of the following works:

Roads 20km tarred with two base layers
Stormwater drains
Culvert pipes
Blasting works

The project started in January 2002 and was completed in August 2002. The project was for housing cooperatives. This project had a lot of blasting work due to the presence of too many rock outcrops on site.

Mobirise

MOUNT PLEASANT BANNOCKBURN ROAD

CLIENT : ASSETFIN CONSULTANT : OVE ARUP AND PARTNERS

The project consisted of the following works:
 
15m2 shelvert
5km road done to highway standards
Culverts

W hen this project was done there was water flowing in the river and we had to divert the water course temporary for us to do the works. At times we had to compliment the diversion channel with pumping.

Mobirise

MOUNT PLEASANT HOUSING SCHEME

CLIENT : ASSETFIN CONSULTANT : OVE ARUP AND PARTNERS

The project consisted of the following works:
 
18km of tarred roads
14km of AC water reticulation pipes
Culvert
pipes
Sormwater drains and pipes

The project started in January 1999 and was completed in December 2002. This was the first housing development project
done by the company. Despite being the first project in housing infrastructure it was completed well ahead ofschedule.

Mobirise

EXPORT PROCESSING ZONE

CLIENT: SUNWAY CITY CONSULTANTS: CGM-CPP JOINT VENTURE

The project consisted of the following works:
 
1 km road
10 000m3 Water Reservoir
500m3 Water Reservoir
8km Asbestos cement water pipeline

The organization did the 10 000m3 tank on the left and the Middle 500m3 conical Tower Water
Reservoir.

Address

20 Balmoral Road
Vainona,
Harare,
Zimababwe